ABOUT NATHAN RIVER RESOURCES
PROJECT BACKGROUND
-
The NRR mine site is located 50km inland from the Gulf of Carpentaria and approximately 760km from Darwin, covering more than 1,861km2
-
In excess of A$250m has been invested in developing the Resource and constructing the fully integrated ‘pit-to-port’
logistics solution -
NRR acquired the mineral titles associated with the Roper Bar iron ore mine from the Receivers and Managers of WDR in November 2017
-
NRR has invested c.A$22m of new equity into infrastructure, PP&E, obtaining and updating access agreements and permits and updating mine plans and engaging with local communities
RESERVES AND RESOURCES
-
A large JORC compliant Resource and Reserve base to support a long term mine life
-
Reserve – 5.6Mt at 60% Fe, plus an expected further 3.7Mt of mining inventory following the completion of metallurgical test work
-
Resource – 446Mt at 40% Fe
-
Bing Bong iron ore has a very high lump proportion (~65%) and is extremely low in phosphorous, making it an ideal blending ore
DEVELOPMENT PLAN
NRR has developed a 2 Stage development plan for the Project. Stage 1 is the initial focus with low capex and immediate production, while Stage 2 offers further upside via exploiting the full extent of the Resource, pending additional study work
-
1.5Mtpa of DSO production with addition of 1.5Mtpa DMS plant expected to produce 1.5-2.0Mtpa at 60% Fe for 5 years
-
DSO component involves simple mining, crushing, dry screening, road haulage, with installation of a DMS plant to ensure product quality
-
Mining and first iron ore shipments planned to commence in October 2020
-
BFO stockpiled during Stage 1
-
Addition of a silica flotation plant to develop the large Resource of 446Mt at 40% Fe in addition to DSO and DMS production, for a combined annual production rate of 5Mtpa at 62% Fe
-
DMS and beneficiation feed of c.73Mt identified at a low 3.8 strip ratio
-
33Mt of concentrate at 61.9% Fe, 7.5% SiO2
-
Further opportunity for mine life extension
-
The further study work necessary to define the Stage 2 is currently in progress
STAGE 1
STAGE 2
-
NRR recently updated its Resource and Reserve statements, incorporating the latest drilling, mine designs and metallurgical testwork for DMS processing
-
A large JORC compliant Resource and Reserve base to support a long term mine life
-
Reserve – 5.6Mt at 60% Fe
-
Resource – 446Mt at 40% Fe
-
-
Additional 3.7Mt of mining inventory (Expansion case) that requires metallurgical test work for conversion from Resource to Reserve
-
Significant waste stripping already completed by WDR,
-
Large stockpile and in-pit broken stock inventory
-
DSO stockpile – 46.5kt at 59% Fe
-
Low Grade / DMS stockpile – 147.8kt at 51.2% Fe
-
Blasted stocks – 1.7Mt, including 151kt DSO at 61% Fe and 103kt DMS at 51% Fe
-
-
Roper Bar iron ore has a very high lump proportion (~65%) and is extremely low in phosphorous, making it an ideal blending ore
-
Installation of beneficiation capacity to develop the large Resource of 446Mt at 40% Fe (“BFO Resource”), in addition to DSO and DMS production
-
The expansion is underpinned by a Tenova Mining and Minerals Concept Study (September 2014) that evaluated the viability of beneficiating the BFO Resource
-
BFO deposits demonstrates reverse silica flotation is a cost-effective means of processing, upgrading and monetising BFO
-
Column flotation test work was performed on Roper Bar iron ore samples from varying deposits to develop flowsheet parameters
-
LoM production of 33.3Mt concentrate at 61% Fe at 4Mtpa
-
Operations will target shallow, flat lying BFO Resources with a low strip ratio in deposits E, F and D, and stockpiled BFO from Stage 1 operations
-
Product upgrade will use silica flotation, a commonly used beneficiation processes for iron ore
-
Further opportunity for mine life extension from deposits A, B and C
-
NRR plans to complete further study work necessary to define the Stage 2 project post commissioning Stage 1